Subscribe to Our
FREE NEWSLETTER
H O M E
Public Experiments
Great Giza Pyramid
Atlantis
Multiple Universes
Climate Change:
2008-2013
Exploding Planet
Base on Mars
"Mysteries" Series
Selected Interviews
Video Library
Mission
Resources
HRVG
CRV Instruction
CRV History and Resources
SRV
IRVA
Eight Martinis (Magazine)
Farsight Press
RSS feed
Corporate Structure
FARSIGHT'S STORE
CONTACT US
Donate to The Farsight Interview
Subscribe to the Farsight Newsletter
Bookmark and Share

Global Climate RV Project Session Download Page

Instructions: Below are the Climate Project sessions organized by targets and viewers. Here is the definition of timelines A and B:

Timeline A: 1 June 2013, 12 noon target local time, following the timeline in which the leadership of the mainstream global scientific establishment continues to ignore or deny (1) the reality of the remote-viewing phenomenon, and (2) the existence of life not originating from Earth.

Timeline B: 1 June 2013, 12 noon target local time, following the timeline in which by the end of 2009 leaders of the mainstream global scientific establishment publicly recognize (1) the reality of the remote-viewing phenomenon, and (2) the existence of life not originating from Earth.

"Clarity scores" are given after all sessions (a capital "C" followed by the clarity score). Clarity scores evaluate the accuracy of the 2008 sessions with respect to the known and verifiable characteristics of the target. Future clarity scores (for 2013) reflect current target characteristics only. Low future scores can be inaccurate if the targets change significantly prior to 2013. Clarity scores can range from 0 to 3, and they convey the following meaning:

3: The known and verifiable target aspects are described exceptionally well with few, minor, or no decoding errors.
2: The known and verifiable target aspects are described well. There may be some notable decoding errors.
1: The known and verifiable target aspects are described minimally. There may also be significant decoding errors.
0: The known and verifiable target aspects are described very poorly or not at all.

Decoding errors occur when a remote viewer perceives something that is real at the target, but the description of this perception is not entirely correct. Again, the perception is real, but the description of it is only partially accurate. For example, if someone describes a city with tall skyscrapers as a mountain range, that is a decoding error. The perception is correct in terms of the topology, but the characterization of it as a mountain range is incorrect. Also, if a person places trees or animals in a barren natural landscape, that is a decoding error. The perception of a natural landscape is correct, but the conscious mind added things that it thought would be normal for a natural landscape. Experienced remote viewers are trained to minimize decoding errors, and analysts are trained to discount decoding errors that would be more common with certain types of targets.

"Disaster scores" are given after the clarity scores, and are noted with a capital "D" followed by the disaster score. Disaster scores reflect the level of catastrophic content that is conveyed by the remote-viewing data. Disaster scores range from 0 to 3 and they convey the following meaning:

Disaster Data: 0=None, 1=Minimal, 2=Significant, 3=Complete

Vaitupu, Tuvalu Target 1: 1 June 2008 Target 2: 1 June 2013, Timeline A Target 3: 1 June 2013, Timeline B
Daz (CRV) Download (Session 7): C3:D0 Download (Session 4): C3:D3 Download (Session 8): C3:D1
Viewer 423 (CRV) Download (Sesson 7): C2:D0 Download (Session 4): C3:D1 Download (Session 8): C2:D3
Pat Sage (CRV) Download (Sesson 7): C3:D0 Download (Session 4): C2:D3 Download (Session 8): C2:D2
Dick Allgire (HRVG) Download (Session 12): C2:D0 Download (Session 9): C2:D2 Download (Session 7): C3:D2
Sita Seery (HRVG) Download (Session 12): C2:D0 Download (Session 9): C2:D0 Download (Session 7): C1:D0
Maria Naulty (HRVG) Download (Session 7): C1.5:D0 Download (Session 4): C1:D0 Download (Session 8): C1:D1
Debra Duggan-Takagi (HRVG) Download (Session 7): C3:D0 Download (Session 4): C3:D0 Download (Session 8): C3:D1

Anne M. Koide (HRVG)

Download (Session 7): C3:D0 Download (Session 4): C3:D2 Download (Session 8): C3:D2
       
Fort Jesus, Mombasa Kenya Target 4: 1 June 2008 Target 5: 1 June 2013, Timeline A Target 6: 1 June 2013, Timeline B
Daz (CRV) Download (Session 6): C3:D1 Download (Session 9): C3:D3 Download (Session 3): C3:D3
Viewer 423 (CRV) Download (Session 6): C3:D0 Download (Session 9): C3:D3 Download (Session 3): C3:D3
Pat Sage (CRV) Download (Session 6): C3:D0 Download (Session 9): C3:D1 Download (Session 3): C2:D3
Dick Allgire (HRVG) Download (Session 15): C1:D2 Download (Session 6): C3:D3 Download (Session 5): C1:D2
Sita Seery (HRVG) Download (Session 15): C2:D0 Download (Session 6): C3:D0

Download (Session 5): C1:D0

Maria Naulty (HRVG) Download (Session 6): C0:D0 Download (Session 9): C2:D0 Download (Session 3): C3:D0
Debra Duggan-Takagi (HRVG) Download (Session 6): C1:D1 Download (Session 9): C3:D3 Download (Session 3): C2:D3

Anne M. Koide (HRVG)

Download (Session 6): C3:D0 Download (Session 9): C3:D0 Download (Session 3): C0:D2
       
Sydney Opera House, Sydney Target 7: 1 June 2008 Target 8: 1 June 2013, Timeline A Target 9: 1 June 2013, Timeline B
Daz (CRV) Download (Session 5): C3:D0 Download (Session 2): C3:D3 Download (Session 10): C3:D3
Viewer 423 (CRV) Download (Session 5): C3:D0 Download (Session 2): C2:D3 Download (Session 10): C3:D1
Pat Sage (CRV) Download (Session 5): C3:D0 Download (Session 2): C2:D3 Download (Session 10): C3:D3
Dick Allgire (HRVG) Download (Session 13): C1:D0 Download (Session 4): C3:D1 Download (Session 2): C2:D1
Sita Seery (HRVG) Download (Session 13): C0:D0 Download (Session 4): C0:D0 Download (Session 2): C0:D0
Maria Naulty (HRVG) Download (Session 5): C3:D0 Download (Session 2): C2:D0 Download (Session 10): C1:D1
Debra Duggan-Takagi (HRVG) Download (Session 5): C2:D1 Download (Session 2): C2:D2 Download (Session 10): C2:D3

Anne M. Koide (HRVG)

Download (Session 5): C3:D0 Download (Session 2): C1:D1 Download (Session 10): C1:D0
       
Mount Kilimanjaro, Tanzania Target 10: 1 June 2008 Target 11: 1 June 2013, Timeline A Target 12: 1 June 2013, Timeline B
Daz (CRV) Download (Session 1): C3:D0 Download (Session 11): C3:D2 Download (Session 12): C3:D1
Viewer 423 (CRV) Download (Session 1): C0:D0 Download (Session 11): C3:D1 Download (Session 12): C3:D3
Pat Sage (CRV) Download (Session 1): C3:D0 Download (Session 11): C3:D1 Download (Session 12): C1:D0
Dick Allgire (HRVG) Download (Session 16): C0:D0 Download (Session 14): C3:D1 Download (Session 11): C1:D0
Sita Seery (HRVG) Download (Session 16): C1:D0 Download (Session 14): C1:D0 Download (Session 11): C0:D0
Maria Naulty (HRVG) Download (Session 1): C3:D0 Download (Session 11): C3:D3 Download (Session 12): C3:D3
Debra Duggan-Takagi (HRVG) Download (Session 1): C2:D0 Download (Session 11): C3:D0 Download (Session 12): C3:D1

Anne M. Koide (HRVG)

Download (Session 1): C3:D0 Download (Session 11): C3:D2 Download (Session 12): C3:D1
       
United States Congress Building Target 13: 1 June 2008 Target 14: 1 June 2013, Timeline A Target 15: 1 June 2013, Timeline B
Dick Allgire (HRVG) Download (Session 8): C1.5:D0 Download (Session 1): C0:D0 Download (Session 17): C0:D3
Sita Seery (HRVG) Download (Session 8): C1:D0 Download (Session 1): C0:D3 Download (Session 17): C2:D0
       
Malé International Airport, Malé Maldives Target 16: 1 June 2008 Target 17: 1 June 2013, Timeline A Target 18: 1 June 2013, Timeline B
Dick Allgire (HRVG) Download (Session 10): C2:D0 Download (Session 18): C3:D3 Download (Session 3): C0:D0
Sita Seery (HRVG) Download (Session 10): C1:D3 Download (Session 18): C0:D3 Download (Session 3): C1:D0
       
KITV Building, Honolulu, Hawaii Target 19: 1 June 2008 Target 20: 1 June 2013, Timeline A Target 21: 1 June 2013, Timeline B
Dick Allgire (HRVG) Download (Session 19): C3:D0 Download (Session 20): C2:D3 Download (Session 21): C1:D3
       
Key West, Florida   Target 28: 1 June 2013, Timeline A Target 29: 1 June 2013, Timeline B
Dick Allgire (HRVG)   Download (Session 28): C0:D3 Download (Session 29): C2:D3

A remote viewer's sessions were matched with the correct targets using the rules below, which depend on how many sessions were done by each viewer in total, 24, 18, or 12. Please note that Dick Allgire did 18 sessions using the second target assignment rule below.

24 Target Assignment >> S1:T12, S2:T15, S3:T5, S4:T4, S5:T17, S6:T19, S7:T21, S8:T23, S9:T9, S10:T24, S11:T6, S12:T11, S13:T22, S14:T2, S15:T20, S16:T18, S17:T16, S18:T1, S19:T10, S20:T14, S21:T7, S22:T8, S23:T3, S24:T13

18 Target Assignment >> S1:T14, S2:T9, S3:T18, S4:T8, S5:T6, S6:T5, S7:T3, S8:T13, S9:T2, S10:T16, S11:T12, S12:T1, S13:T7, S14:T11, S15:T4, S16:T10, S17:T15, S18:T17

12 Target Assignment >> S1:T10, S2:T8, S3:T6, S4:T2, S5:T7, S6:T4, S7:T1, S8:T3, S9:T5, S10:T9, S11:T11, S12:T12